    • What is specification 733-04?

      Specification §733-04 is being assigned the material specifications related to subbase course. Specification §733-05 through Specification §733-07 and Specification §733-19 are being assigned the material specifications related to recycled materials that may be used as an alternate to a granular subbase material.


    • What does 733-20 mean?

      Revision to Standard Specification Standard Specification §733-20 BACKGROUND: Underdrains are perforated or porous pipes, installed in narrow trenches and surrounded by underdrain filter material that is both pervious to water and capable of protecting the pipe from infiltration by the surrounding soil.


    • What is the scope of 733-09 select borrow?

      SCOPE.This specification covers the material requirements and methods of testing select fill material generally used for backfilling in areas beneath the watertable. SAMPLING.The sampling procedure contained in §733-09 Select Borrow shall apply. MATERIAL REQUIREMENTS. The material requirements contained in §733-09 Select Borrow shall apply.



    • EI - Government of New York

      §733-21 Stone Filling 1. Incorporated the subsection “B. Composition” in the Material Requirements 2. Added the requirement that approved off-site stockpiles will be accepted on the contract site by delivery ticket. §733-22 Rip Rap 1. Incorporated the subsection “B. Composition” in the Material Requirements 2.


    • [PDF File]InstallatIon sheet 733 Wiegand Interface Module

      https://info.5y1.org/1-or-2-733-733_1_19a0f9.html

      The 733 operates on either 12 VDC or 24 VDC input and provides four supervised, programmable zones. Zones 1, 2 and 3 can be programmed for a variety of burglary or access control applications and zone 4 can be programmed as a fire zone. Additionally, the module supplies a programmable Form C Single Pole Double Throw (SPDT) Door Strike


    • ENGINEERING INSTRUCTION - Government of New York

      Specification 17 and Specification §733-§733-18 are being assigned the material specifications related to embankment construction control devices. Specification §733-20 is being assigned the material specifications related to underdrain filter material. Specification §733-21 through Specification 733-23 are being assigned th§ e material



    • Title: §733-20 UNDERDRAIN FILTER MATERIAL SUPERSEDED BY EB 22 ...

      EI 21-026 Page 1 of 2 L 05/01/22 Incorporate the following changes into the Standard Specifications that will be effective on May 1, 2022: Delete §605-2.02 C. in its entirety and Replace it with the following: C. Underdrain Filter Type III. Provide material meeting the requirements of §733-20 Underdrain Filter, Type 3.


    • [PDF File]Selecting Material Codes, Sample Types and Dest. Labs for ...

      https://info.5y1.org/1-or-2-733-733_1_01cbf1.html

      733-0212 MSES Backfill, #2 Size Gradation 733-0221 MSES Backfill, Recycled Concrete Agg. 733-0222 MSES Backfill, Recycled Conc. Agg. #2 733-03 GRES Backfill Material 733-0401 Subbase Course, Type 1 733-0402 Subbase Course, Type 2 733-0403 Subbase Course, Type 3 733-0404 Subbase Course, Type 4