Airport construction contractors
[DOC File]Supplemental specification #9
https://info.5y1.org/airport-construction-contractors_1_5a8435.html
Replace sections 70-11, 70-12, 70-14, 70-18 of the standard specifications for airport construction 1998 edition, and replace with the following. 70-11 Responsibility for Damage and Tort Claims (1) The contractor and the contractor's insurer shall defend, indemnify, and save harmless the following entities: 1.
[DOCX File]AC 150/5370-10H, Standard Specifications for Construction ...
https://info.5y1.org/airport-construction-contractors_1_1216fd.html
The Engineer should include a section on airport safety in the bid documents that has, as a minimum, the information contained in AC 150/5370-2, Operational Safety on Airports During Construction; the Construction Safety and Phasing Plan (CSPP); and any additional requirements as a result of a Safety Risk Management (SRM) review, if required.
[DOC File]AC 150/5370-16, RAPID CONSTRUCTION OF RIGID …
https://info.5y1.org/airport-construction-contractors_1_96f70b.html
Radio Frequencies. On large paving projects, project managers, contractors, airport management, and security personnel must coordinate to ensure that the radio frequencies used for contact and control of day-to-day construction operations by radio do not conflict with existing frequencies used for air traffic, security, and emergency purposes.
Equipment and Construction Contracts – Airport Improvement ...
Equipment and Construction Contracts – Airport Improvement Sponsor Certification Keywords: Sponsor certification, construction, equipment, contracts Last modified by: Andrew C. Hanks Company: GRA, Inc.
[DOC File]CONTRACTOR TRAVEL REIMBURSEMENT GUIDELINES
https://info.5y1.org/airport-construction-contractors_1_c2fec4.html
CONTRACTOR TRAVEL REIMBURSEMENT GUIDELINES. January 2004. 1.0. INTRODUCTION. The Contractor should have a policy that requires its employees to use sound business judgement in both determining the need for travel, as well as in expending Contractor financial …
[DOC File]FORMS - TABLE OF CONTENTS - Auckland Airport
https://info.5y1.org/airport-construction-contractors_1_4a212c.html
A list of authorized Auckland Airport permit issuers is available from the persons named in 3 or 4 below. Auckland Airport Staff or Lessees/Concessionaires and their contractors must complete sections 1 & 2 of this form, and scan or email it to the relevant Auckland Airport Authorising Manager for …
[DOC File]NOTICE TO CONTRACTORS - Bluegrass Airport
https://info.5y1.org/airport-construction-contractors_1_e4ebed.html
FAA CONSTRUCTION. BX58:33156:71342:7:LEXINGTON . Title: NOTICE TO CONTRACTORS Author: AGorham Last modified by: Lynn Hoard-Wilson Created Date: 8/12/2016 2:49:00 PM Company: Blue Grass Airport Other titles: NOTICE TO CONTRACTORS ...
[DOC File]Design-Build (DB) Request for Proposal (RFP) Template with ...
https://info.5y1.org/airport-construction-contractors_1_174262.html
A construction camp has been allowed in remote parks where campgrounds have been made available for the Contractors use by the Park or Concessionaire. Consult with park on the need and availability and edit as required. Construction Camp: Establishment of a construction camp will not be permitted. Construction Zones
[DOC File]AC 150/5210-20, Ground Vehicle Operations on Airports, 31 ...
https://info.5y1.org/airport-construction-contractors_1_849dae.html
When there is construction on an airport, whether federally funded or not, the airport operator should follow the ground vehicle practices contained in AC 150/5370-2. At airports without an operating ATCT, two-way radio control between vehicles and fixed-based operators or other airport users should avoid frequencies used by aircraft.
Nearby & related entries:
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.