Army acquisition strategy guide

    • [DOCX File]Chapter 1

      https://info.5y1.org/army-acquisition-strategy-guide_1_085937.html

      Where appropriate, Army gaming and its attendant gaming environment facilitate after action reviews (AARs), mission planning, connectivity to mission command systems, interoperability with other TADSS, and the ITE. Examples of Army games are first person shooter/thinker, turn-based and real-time strategy, and construction management applications.

      army acquisition requirements documents


    • [DOCX File]ADVANCE ACQUISITION PLANNING (AAP)

      https://info.5y1.org/army-acquisition-strategy-guide_1_ab2c5e.html

      In addition to a formal acquisition plan, acquisition strategies will also be prepared and approved for acquisition of services in accordance with AFARS 5137.5 and the ACA Army Service Strategy Panels (ASSP) Guide. The Guide provides specific guidance on the ASSP process, supporting documentation and specific content.

      army acquisition process


    • [DOCX File]ASI Template: Acquisition Plan Templates

      https://info.5y1.org/army-acquisition-strategy-guide_1_8e9a3a.html

      ACQUISITION PLAN TEMPLATES. The purpose of these templates is to provide a guide for the preparation of acquisition planning documents. Because of the wide variation between the documentation required from one acquisition to another and the items or services that may be acquired, these templates cannot be simple "fill-in-the-blank" documents.

      us army acquisition process


    • [DOC File]Acquisition Strategy (Template) - AcqNotes

      https://info.5y1.org/army-acquisition-strategy-guide_1_a59854.html

      The purpose of this Acquisition Strategy is to describe how the [PROGRAM] acquisition will be executed. This Acquisition Strategy is to be updated through an iterative process to ensure the document reflects the current state of the Program. It also reflects the [PROGRAM’S] tailored approach to the execution of DoD acquisition program ...

      dod acquisition strategy guide


    • [DOCX File]DFARS - Acquisition

      https://info.5y1.org/army-acquisition-strategy-guide_1_f7baff.html

      PGI 201.109 Statutory acquisition-related dollar thresholds – adjustment for inflation. Statutory acquisition-related dollar thresholds are reviewed every 5 years to calculate adjustment for inflation, as required by Section 807 of the National Defense Authorization Act …

      army acquisition process flowchart


    • [DOC File]DEPARTMENT OF DEFENSE - OUSD Acquisition & …

      https://info.5y1.org/army-acquisition-strategy-guide_1_ee921b.html

      The warranty strategy must be compatible with the system/subsystem acquisition strategy, logistics support planning and supportability strategy, test and evaluation programs, system operational concepts, and Contractor support planning. ... “AFMC Warranty Guide,” February 2006 . c. Army Regulation 700-139, “Army Warranty Program ...

      acquisition strategy pdf


    • [DOC File]Project Management Plan Template - United States Army

      https://info.5y1.org/army-acquisition-strategy-guide_1_f948d5.html

      This includes the project contracting strategy and the project acquisition strategy. The Project Manager will have to work closely with the procurement organization and the contracting organization to ensure that the required goods and services will be available when needed.

      acquisition strategy vs acquisition plan


    • [DOC File]TEMPLATE

      https://info.5y1.org/army-acquisition-strategy-guide_1_15fa2d.html

      DESP II User’s Guide. Feb 2010. Streamlined Acquisition Plan (SAP) TEMPLATE. Streamlined Acquisition Plan: The Streamlined Acquisition Plan (SAP) is a tool used to accomplish acquisition planning documentation required in FAR 7.1 and AFMC FAR 5307.1. A SAP is required for all DESP II task orders from >$5.5M -

      army acquisition strategy template


    • [DOCX File]PERFORMANCE WORK STATEMENT (PWS) - United States Army

      https://info.5y1.org/army-acquisition-strategy-guide_1_aa668e.html

      PERFORMANCE WORK STATEMENT (PWS) Programmatic. Support for the Fixed Wing Product . Management . Office. 1.0. MISSION OBJECTIVE: The Fixed Wing Product Management Office (FWPMO) provides centralized life-cycle management of the Army’s fleet of existing and emerging Fixed Wing aircraft to include such systems as C-12, RC-12, UC-35, C-20, C-26, C-37, EO-5, EMARS, C-23 and …

      army acquisition requirements documents


Nearby & related entries: