SECTION 233600 - AIR TERMINAL UNITS
ASHRAE Compliance: Applicable requirements in ASHRAE 62.1-2004, Section 5 - "Systems and Equipment" and Section 7 - "Construction and Startup." AHRI 880 – Performance Testing for Air Terminal Units. Mockup: Provide mockup of typical [exterior] building module. If acceptable, mockup will demonstrate minimum standard for the Work.
[DOCX File]Section 23 05 93 - TESTING, ADJUSTING, AND BALANCING …
https://info.5y1.org/ashrae-62-1-read-only_1_b90ab8.html
The publications are referenced in the text by the basic designation only. ... Applicable requirements in ASHRAE 62.1, "Air Balancing." ASHRAE/IESNA Compliance: Applicable requirements in ASHRAE/IESNA 90.1, "System Balancing." ... Read pressure differential across the pump. Convert pressure to head and correct for differences in gage heights.
[DOCX File]Home | Infrastructure Planning and Facilities
https://info.5y1.org/ashrae-62-1-read-only_1_22cffe.html
LEED Prerequisite IEQ 1 requires compliance with requirements in ASHRAE 62.1, Section 7.2.2, "Air Balancing." ASHRAE 62.1 requires that ventilation systems be balanced according to ASHRAE 111, SMACNA's "HVAC Systems - Testing, Adjusting, and Balancing," or equivalent at least to extent necessary to verify compliance with the standard.
[DOCX File]PURPOSE - Home | ashrae.org
https://info.5y1.org/ashrae-62-1-read-only_1_c65c3a.html
Aug 03, 2020 · the 0.8 m/s (150 fpm) supply air jet reaches to within 1.4 m (4.5 ft) of floor level as indicated in ASHRAE Standard 62.1-2016, Table 6.2.2.2. This can be done in most zones by setting Pfan-htgmax to ensure these conditions are maintained.
[DOC File]Other Mobile Home Measures - Energy
https://info.5y1.org/ashrae-62-1-read-only_1_6fd158.html
American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) Standard 62-1989 (also called ASHRAE 62.1) or ASHRAE 62.2. Measure the flow rate of exhaust fans to determine if the exhaust fans have adequate airflow.
SECTION 230593 - TESTING, ADJUSTING, AND BALANCING …
Comply with requirements in ASHRAE 62.1-2004, Section 7.2.2 - "Air Balancing." PREPARATION [Ensure the balancing organization checks and reports] [Check and report] defects or deficiencies that may affect balancing. Provide sufficient time before completion date to complete balancing operations.
SECTION 01 81 13 - SUSTAINABILITY REQUIREMENTS - …
Incorporate only if the project Owner requires this information. Select the appropriate certification(s) based on the project requirements. ... ASHRAE Standard 62.1: Ventilation for Acceptable Indoor Air Quality (ANSI Approved). Sections 4 through 7. Definition of minimum outdoor air rate.
[DOC File]SECTION 230593 - TESTING, ADJUSTING, AND BALANCING …
https://info.5y1.org/ashrae-62-1-read-only_1_33fed9.html
LEED Prerequisite IEQ 1 requires compliance with requirements in ASHRAE 62.1, Section 7.2.2 - "Air Balancing." ASHRAE 62.1 requires that ventilation systems be balanced according to ASHRAE 111 or SMACNA's "HVAC Systems - Testing, Adjusting, and Balancing," or be equivalent at least to extent necessary to verify compliance with the standard.