[DOC File]UNIT: CL-40
https://info.5y1.org/build-handrail-for-deck-stairs_1_13c75f.html
Deck plate & structural support steel for deck plate. Stairways (2) to pits, handrail at deck openings & stairways. Main control panel. ECPL. Run stop pull chord at the end of the conveyor. The following list of items is to be provided by others: Pits, pit drawings. The following high level list of items is to be supplied and installed by this ...
[DOCX File]2. General guide for scaffolds and scaffolding work
https://info.5y1.org/build-handrail-for-deck-stairs_1_5731d9.html
Stairs should be secured to the scaffold bay. If stairs cannot be self-secured to the scaffold they should be lashed. If not secured the designer or supplier should provide documentation showing the maximum amount of clearance allowed between the …
[DOCX File]CORPORATION - Adams County, Washington
https://info.5y1.org/build-handrail-for-deck-stairs_1_fe6cdb.html
Full height section through stairways including dimensions of riser and tread framing materials; riser height, tread width; handrail height above tread nosing; and clearance to ceiling above the stairs, include framing anchor connection of stringer to floor framing, and grasp dimensions, distance between any intermediate rails, fire blocking, minimum head room and landing size.
[DOC File]SECTION 055200 - METAL RAILINGS
https://info.5y1.org/build-handrail-for-deck-stairs_1_a1ef67.html
Aluminum Continuous Handrail. may also be used in conjunction with any of the DSI . PolyRail® Vinyl Railing. Systems. If the . Aluminum Continuous. Handrail. system is to be include in this project as part of the vinyl railing system, then include this section and Section 066300 “Plastic Railings” in the project manual. Principal Products ...
[DOC File]SECTION 055200 - METAL RAILINGS
https://info.5y1.org/build-handrail-for-deck-stairs_1_e5699a.html
Aluminum Continuous Handrail. may also be used in conjunction with any of the DSI . PolyRail® Vinyl Railing. Systems. If the . Aluminum Continuous. Handrail. system is to be include in this project as part of the vinyl railing system, then include this section and Section 066300 “Plastic Railings” in the project manual. Principal Products ...
[DOCX File]Managing the Work Environment and Facilities Code of Practice
https://info.5y1.org/build-handrail-for-deck-stairs_1_bec31f.html
Entry and exit routes, stairs and walkways should be adequately lit. Open sides of staircases should be guarded with an upper rail at 900 mm or higher and a lower rail. A handrail should be provided on at least one side of every staircase. Additional handrails may be needed down the centre of wide staircases.
[DOCX File]Patio Decks - Wahpeton, North Dakota
https://info.5y1.org/build-handrail-for-deck-stairs_1_5c2f3e.html
stairs. at a height between 34 and 38 inches. Guardrails are required on any open sides of stairways that connect to a deck more than 30 inches above grade. Open risers are not allowed on stairways unless they are constructed so that a 4” …
[DOCX File]Zumbrota, MN
https://info.5y1.org/build-handrail-for-deck-stairs_1_2ad3b9.html
Full size sets of construction plans (enough detail so someone else could build it for you without talking to you) Should include braced wall calculations and layout. Footing and foundation size, height, type, rebar, etc. Window sizes, door sizes, header sizes, etc. Dimensions/Scale. Site plan showing setbacks to property lines/other buildings ...