    • [DOC File]SAMPLE LETTER #1

      https://info.5y1.org/construction-delay-claim-letter_1_edfa6a.html

      If we do not receive any notification from you within fifteen (15) days of the letter, we will assume you are in agreement with the final contract quantities and have no disputes. We will, proceed with the processing of the final estimate. Very truly yours, _____ Your name. Engineer-In-Charge. Cc: Regional Construction …

      construction delay letter


    • [DOC File]SHORT FORM STANDARD SUBCONTRACT

      https://info.5y1.org/construction-delay-claim-letter_1_605f6d.html

      DELAY. Should Subcontractor delay Contractor, any other Subcontractor, or anyone else on the. Project, Subcontractor will indemnify Contractor and hold Contractor harmless for any damages, claims, demands, liens, stop notices, lawsuits, attorneys' fees, and other costs or liabilities imposed on Contractor connected with said. delay …

      construction delay claim form


    • [DOCX File]GC21 sample letter 54B - Refusal of extension of time

      https://info.5y1.org/construction-delay-claim-letter_1_aac2b3.html

      Claim; the delay, if any, occurred concurrently with a delay that was within the Contractor’s control; the delay, if any, was due to the Contractor's own failure to proceed with due expedition and without delay; and. the delay…

      insurance claim delay letter


    • [DOC File]CHAPTER 11

      https://info.5y1.org/construction-delay-claim-letter_1_bd1295.html

      The construction log should contain daily reports that record at least the following: the daily temperature, the daily amount of precipitation, delays in obtaining labor and materials, including the duration and the applicable construction …

      construction delay claims pdf


    • [DOCX File]SL120 Contractor’s Notice of Delay and Claim for Extension ...

      https://info.5y1.org/construction-delay-claim-letter_1_640ad9.html

      Contractor’s Notice of Delay and Claim for Extension of Time (days stated) (Clause 35.5). SL1. 20. Contract Administration System, Transport and Main Roads, June 20151 of 1

      construction delay claim template