Construction site inspection sheet

    • [DOC File]OCCUPATIONAL AND SAFETY - Public Works

      https://info.5y1.org/construction-site-inspection-sheet_1_3fceb7.html

      On site available for inspection Contractor 21. 19(2)(g)(ii) Issuing and collection of cartridges and nails or studs (Explosive Powered Tools) recorded in register – recipient signed for receipt as well as return Contractor 22. 21(1)(j) Findings of daily inspections (prior to use) of Construction Vehicles and Mobile Plant Contractor 23. 22(d ...


    • [DOC File]Management Review - HUD

      https://info.5y1.org/construction-site-inspection-sheet_1_b05c64.html

      4. Document the year of construction for Lead-Based Paint compliance. Obtain this information from the Physical Condition/PASS screen in iREMS Open the REAC Inspection Report, then open the PASS Physical Inspection Report. The year of construction can be found under Buildings/Units.


    • [DOC File]Section 13 34 19 - Metal Building Systems

      https://info.5y1.org/construction-site-inspection-sheet_1_6e055b.html

      AWS D1.3 / D1.3M – Structural Welding Code – Sheet Steel. Association for Iron & Steel Technology (AISE): AISE 13 – Specifications for Design and Construction of Mill Buildings. ASTM International (ASTM): ASTM A 325 – Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength.


    • [DOC File]OHSE Management Plan

      https://info.5y1.org/construction-site-inspection-sheet_1_ba2be3.html

      OHSE 014–Workplace inspection checklist 21. OHSE 015–Plant and equipment 24. ... Before a product or substance is used for the work activity, INSERT ORGANISATION reviews the Material Safety Data Sheet (MSDS) to determine if the product or substance is classified as hazardous. ... Construction and Demolition Sites and AS3000, Wiring Rules.


    • [DOC File]Template for Developing Sewer Collection System Preventive ...

      https://info.5y1.org/construction-site-inspection-sheet_1_f26718.html

      This inspection and testing process must be completed prior to backfilling and before [Insert City/Town name] will accept the infrastructure from the construction contractor. [Insert a sentence or two to describe your program for electronic maps or one-year performance of the new infrastructure if …


    • [DOC File]PROVISIONING, ALLOWANCE AND FITTING OUT SUPPORT …

      https://info.5y1.org/construction-site-inspection-sheet_1_93d02e.html

      4.3 ISS Storage Site . The Contractor shall operate an ISSP as a bonded storage site for spare and repair parts during the ISS period. The Contractor ISSP shall receive, hold, store, issue, account for, identify, mark, preserve, package, label, pack, prepare for shipment, document, and ship interim support spare and repair parts.


    • [DOCX File]SECTION 01 00 00, GENERAL REQUIREMENTS

      https://info.5y1.org/construction-site-inspection-sheet_1_211f57.html

      The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:


    • [DOC File]Building contract for new homes

      https://info.5y1.org/construction-site-inspection-sheet_1_6d4078.html

      17.4 Where the Builder made available for inspection a home or a building suitable for use as a home to encourage the Building Owner to enter into a contract for the construction of a similar home, the Builder will perform the Work:


    • [DOCX File]Section 23 22 13 - STEAM AND CONDENSATE HEATING …

      https://info.5y1.org/construction-site-inspection-sheet_1_e211ff.html

      Housing construction: 16-gauge, G-90 galvanized steel panels fabricated into self-framing, double standing seam-type construction. All joints shall be caulked weather tight with a silicone sealant. All interior surfaces shall be insulated with 25 mm (1 inch), 10.8 kg per square meter (2.2 pounds per square foot) rigid, noncombustible glass ...


    • [DOCX File]Sample Pandemic Plan

      https://info.5y1.org/construction-site-inspection-sheet_1_d04193.html

      9.5We have selected the following alternative site(s), in the event it is needed: _____ (enter alternative site(s)). We estimate that in a worst-case scenario, we shall occupy this site for _____ (enter the time estimate). _____ (enter name/title of person(s) responsible) shall decide when it may be necessary to move to the alternative site(s).


Nearby & related entries: