Data center infrastructure management

    • [DOCX File]Hybrid Cloud Services Solution Overview

      https://info.5y1.org/data-center-infrastructure-management_1_c11422.html

      The VDC is required to abstract the various hardware components into known, standardized, and easily consumable data center resources. The VDC is composed of Virtual Hardware / Operating Systems, network, middleware, and storage across the State of Texas infrastructure and various Public and Private Clouds.


    • [DOC File]Core IT Audit Program - UCOP

      https://info.5y1.org/data-center-infrastructure-management_1_b67691.html

      The system-wide Joint Data Center Managers, referenced above, uses Information Technology Infrastructure Library (ITIL) as an integrated, process-based, best practice framework for managing IT services.


    • [DOCX File]Introduction to Gail Industries - University of Phoenix

      https://info.5y1.org/data-center-infrastructure-management_1_345289.html

      An uninterruptible power supply (UPS) is in place to provide temporary electricity in the event of a power outage and mitigate the risk of power surges impacting infrastructure to the data center. Management retains the following inspection reports completed by the third-party vendors as evidence of their completion:


    • Configuration Management Plan Template

      To attain the optimum degree of uniformity in configuration management policy, procedures, data, forms, and reports at all interfaces. ... Tier 1 Regional Processing Center, Performance Service Level Agreement (PSLA)”, Section 1.01, for Rational Enterprise Suite ... System Administration (Infrastructure) Manages the development and test ...


    • [DOC File]Data Center Design Guidelines

      https://info.5y1.org/data-center-infrastructure-management_1_201b67.html

      All Data Center-related installations—including but not limited to room infrastructure, in-room electrical, standby power, cooling, data cabling, monitoring lights, and fire suppression systems—must be completed at least (2) weeks prior to cutover of the site.



    • [DOC File]Month 00, 200X

      https://info.5y1.org/data-center-infrastructure-management_1_839e17.html

      Satinder Sethi, Vice President, Data Center Solutions Engineering and UCS Product Management, Cisco “Our jointly-developed data center infrastructure solutions like FlexPod provide cost-effective scalable, flexible, and manageable technologies that reduce IT complexity and increase operational efficiency.


    • [DOC File]Energy Efficiency Assessment Report Format

      https://info.5y1.org/data-center-infrastructure-management_1_7340e6.html

      Figure 4 - Data Center Infrastructure Efficiency (DCiE) Figure 4 - Data Center Power Utilization Effectiveness (PUE) Figure 6 - IT equipment power/HVAC power. 5.2 Air Management and Air Distribution Metrics. Several server intake and exhaust temperatures were collected from a representative sample of servers in the data center.


    • [DOCX File]Data Center Standards - IU

      https://info.5y1.org/data-center-infrastructure-management_1_6fc3bd.html

      All enterprise racks come standard with one switch installed at the top of the cabinet to provide 48 ports of 10/100/1000 Mbps Ethernet connections into the data center switching infrastructure. 10G or additional 1G switches are available by request at an additional cost.


    • [DOCX File]USDA | Departmental Management (DM) | Home

      https://info.5y1.org/data-center-infrastructure-management_1_dbf328.html

      associate chief information officer data center operations - infrastructure operations division - information technology service management branch (ag-it-51-60-3000-00-00-00-00) ASSOCIATE CHIEF INFORMATION OFFICER DATA CENTER OPERATIONS - ARCHITECTURE AND SYSTEMS INTEGRATION DIVISION (AG-IT-51-70-0000-00-00-00-00)


    • [DOC File]Master Project Plan - California

      https://info.5y1.org/data-center-infrastructure-management_1_e65289.html

      The project consists of six major parts 1) Infrastructure Upgrades; 2) Data Center Implementation; 3) Vendor Development; 4) OSI Management; 5) Verification and Validation; and 6) Independent Project Oversight Consultant as shown in the work breakdown structure, Appendix A.


    • [DOCX File]System Design Document Template - CMS

      https://info.5y1.org/data-center-infrastructure-management_1_099565.html

      Instructions: Provide identifying information for the existing and/or proposed automated system or situation for which the System Design Document (SDD) applies (e.g., the full names and acronyms for the development project, the existing system or situation, and the proposed system or situation, as applicable), and expected evolution of the document.


    • [DOCX File]Statement of Objectives (SOO) For Cloud Migration Services

      https://info.5y1.org/data-center-infrastructure-management_1_45f61d.html

      : Produced by the Office of Management & Budget (OMB), the February 2011 Federal Cloud Strategy outlines the impetus and benefits of migrating to cloud services, including acceleration of data center consolidation and better utilization of existing infrastructure assets.


    • [DOC File]Contingency Plan Template

      https://info.5y1.org/data-center-infrastructure-management_1_7944c1.html

      PDD 63, Critical Infrastructure Protection, May 1998. Federal Emergency Management Agency (FEMA), The Federal Response Plan (FRP), April 1999. Defense Authorization Act (Public Law 106-398), Title X, Subtitle G, “Government Information Security Reform,” October 30, 2000 [Any other applicable federal policies should be added.]