Fhwa pay period calendar 2020

    • STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

      The Recipient agrees to complete the Project on or before . If the Recipient does not complete the Project within this time period, this Agreement will expire on the last day of the scheduled completion as provided in this paragraph unless an extension of the time period is requested by the Recipient and granted in writing by the Department prior to the expiration of this Agreement.


    • [DOC File]Ohio Department of Transportation

      https://info.5y1.org/fhwa-pay-period-calendar-2020_1_46721d.html

      Jan 08, 2020 · 2) Form FHWA-1273 (most recent revision at contract execution) Part IV. Payment of Predetermined Minimum Wage and Part V. Statements and Payrolls. The failure to pay prevailing wages to all laborers and mechanics employed on this project, shall be considered a breach of contract.


    • [DOC File]MANAGEMENT REVIEW ELEMENTS – HIGHWAY SAFETY …

      https://info.5y1.org/fhwa-pay-period-calendar-2020_1_3d2c2d.html

      FHWA Final Rule Open Container 23 CFR Part 1270 and FHWA Final Rule Repeat Intoxicated Driver 23 CFR Part 1275 Yes No N/A 3. For FY18 F: Ensure that each fiscal year the Federal funds contribution for P&A activities does not exceed 13 percent (FY2019 and forward) of the total Section 402 funds received by the State (and sections 410, 154 and ...


    • [DOCX File]Pre-Construction Conference Checklist

      https://info.5y1.org/fhwa-pay-period-calendar-2020_1_eef04a.html

      07/2020. Page 14 of 17. Kentucky Transportation Cabinet. Division of . Construction. ... For all Federal Aid contracts, contractor shall include FHWA 1273 in each executed subcontract. ... This report must be submitted for your last work period worked in July.


    • [DOC File]AGREEMENT

      https://info.5y1.org/fhwa-pay-period-calendar-2020_1_08abc2.html

      The Owner may, at any time, by written order to the Consultant, require the Consultant to stop all, or any part, of the work called for by this Agreement for a period of up to 90 days after the order is delivered to the Consultant, and for any further period to which the parties may agree.


    • [DOCX File]Design Manual 1010 Final

      https://info.5y1.org/fhwa-pay-period-calendar-2020_1_04358e.html

      Aug 27, 2020 · Work Zone Safety and MobilityChapter 1010. Chapter . 101. 0. Work Zone Safety and Mobility. Page . 101. 0-20. WSDOT Design Manual M 22-01. 19. September 2020…


    • [DOC File]IMPORTANT INFORMATION REGARDING THE

      https://info.5y1.org/fhwa-pay-period-calendar-2020_1_67cc69.html

      Documentation of this pay rate is required. However, if the labor provided is not part of the individual’s usual job description, the hourly rate will be valued at $15.00 per hour. Fringe rates, overtime pay, administrative labor, including time spent administering the LWCF grant, is …


    • FHWA-1273 Electronic version -- March 10, 1994

      Such records shall be retained for a period of three years following the date of the final payment to the contractor for all contract work and shall be available at reasonable times and places for inspection by authorized representatives of the contracting agency and the FHWA. ... in the sum of $10 for each calendar day on which such individual ...


    • [DOC File]ED Application - Kentucky

      https://info.5y1.org/fhwa-pay-period-calendar-2020_1_d788de.html

      FY 2020 GRANT APPLICATION. FEDERAL HIGHWAY ADMINISTRATION (FHWA) ... reports shall be submitted by the 15th day of the month following the last day of each calendar quarter (i.e. January 15, April 15, July 15, and October 15). ... Payroll register by pay period showing names, hours worked, hourly rate, benefits, deductions, gross pay, and net ...


    • [DOCX File]STAND ALONE PROJECT CONTRACT

      https://info.5y1.org/fhwa-pay-period-calendar-2020_1_cfa5dc.html

      The contractor or subcontractor shall insert Form FHWA-1273 in any subcontracts and also require the subcontractors to include Form FHWA-1273 in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR 5.5.


Nearby & related entries:

To fulfill the demand for quickly locating and searching documents.

It is intelligent file search solution for home and business.

Literature Lottery

Advertisement