Hall contracting ky

    • PART I - Frankfort, Kentucky

      The City of Frankfort will receive sealed bids for Frankfort – US-60 East Main Street Drainage, and all work associated with that project, in the Office of the Purchasing Division, (Finance Department), City Hall 315 West Second Street, Frankfort, Kentucky until May 27, 2020 @ 2:00 pm EDT. PLANS AVAILABLE FOR THIS PROJECT.

      hall construction ky


    • [DOC File]Construction to Begin on Clark Memorial Bridge

      https://info.5y1.org/hall-contracting-ky_1_297e8c.html

      Hall Contracting of Louisville was awarded the contract for this project in the amount of $1.07 million. Construction is scheduled for completion by April 15, 2013. The painting of the steel on the Indiana approach will be performed under separate contract this summer.

      hall contracting louisville ky


    • DOCKET-REGULAR MEETING-LEXINGTON-FAYETTE URBAN

      A Resolution authorizing and directing the Mayor, on behalf of the Urban County Government, to execute Change Order No. 1 to the Contract with Hall Contracting of Kentucky, Inc., for Town Branch and West Hickman Wastewater Treatment Plants Electrical Service Switchgear Modifications, increasing the Contract price by the sum of $62,274.35 from ...

      hall contracting of kentucky inc


    • [DOC File]WESTERN KENTUCKY UNIVERSITY

      https://info.5y1.org/hall-contracting-ky_1_afd8db.html

      The Snell Hall replacement is under construction and the STH renovation is in design. Both projects are scheduled to complete in December 2008. Academy of Mathematics and Science – This project will renovate Schneider Hall to prepare it to be converted into a residence hall and study center for the Academy of Mathematics and Science in Kentucky.

      pace contracting louisville ky


    • [DOCX File]I-275 Carroll Cropper Bridge Restoration Project

      https://info.5y1.org/hall-contracting-ky_1_637b51.html

      Hall Contracting of Kentucky, Inc, of Louisville, was awarded the contract on a low-bid of $6.7 million. Beginning, May 4, traffic will be reduced to one lane in each direction. Beginning sometime in late June or early July, the I-275 westbound bridge will be closed.

      hall contractors


    • [DOC File]ATTACHMENT 6-3

      https://info.5y1.org/hall-contracting-ky_1_2d3297.html

      Sample copies of WH 347 and WH 348 may be obtained from the Government contracting or sponsoring agency, and copies of these forms may be purchased at the Government Printing Office. ... If an individual was sent to the union hiring hall for referral and not referred back to the Contractor by the union or, if referred back, not employed by the ...

      construction ky


    • [DOCX File]Legislative Record - Kentucky

      https://info.5y1.org/hall-contracting-ky_1_d0dd5f.html

      Request the Joint Committee on the Library of Congress replace one of Kentucky's statues in the National Statuary Hall with a statue of Alice Allison Dunnigan; create the Kentucky Statuary Hall Commission. Dec 03, 2020 - Prefiled by the sponsor(s). Jan 05, 2021 - introduced in Senate. SCR7 (BR162) - R. Mills

      hall contracting corp


    • [DOCX File]Minority and Women Business Enterprise Certification Program

      https://info.5y1.org/hall-contracting-ky_1_b64120.html

      Full site design services include landscape architecture, civil engineering, and site planning. Specialties include Master planning, sit analysis & selection, site design and layout, grading & drainage, landscape design, green infrastructure design & LEED documentation, hydraulic analysis & engineering, sanitary sewer engineering, water line distribution engineering, …

      hall construction louisville ky


Nearby & related entries:

To fulfill the demand for quickly locating and searching documents.

It is intelligent file search solution for home and business.

Literature Lottery

Advertisement