Jul 30, 2018 · Start-up and Initial Checkout Plan: The CxA shall assist the contractor in developing pre-functional checklists and a detailed start-up plan for all commissioned equipment. The primary role of the CxA in this process is ensure that there is written documentation that each of the manufacturer-recommended procedures have been completed.
[DOC File]Functional Operation - ACG: AABC Commissioning Group
https://info.5y1.org/hvac-start-up-checklist-forms_1_cc895a.html
On a signal to start the supply and return fans, open the return air dampers and crack the outdoor air damper (5% open). Start the supply and return (AHU-1 only) fans on a minimum speed. After fan status is proven, modulate the dampers in a normal manner. Modulate the speed of the supply fans to maintain the required duct static pressure.
[DOC File]Commissioning - M&E Prefunctional Checklists
https://info.5y1.org/hvac-start-up-checklist-forms_1_0294f9.html
Contractor shall develop prefunctional checklists with the start-up plans. Electronic copies of these checklists are available upon request. Sample forms of similar rigor will be provided to the Contractor by the CA upon request for other equipment (e.g. VAV terminal units). PART TWO - PRODUCTS. NOT USED. Sample Prefunctional Checklist
[DOC File]Commissioning and Start-up - PDO
https://info.5y1.org/hvac-start-up-checklist-forms_1_6102b4.html
In order to prepare for the pre start-up audit, projects are encouraged to perform an internal assessment to establish their own baseline / checklist of issues and problems requiring to be addressed in advance, to satisfy the pre start-up audit. This should be completed against a Pre Start-up Audit Checklist.
[DOCX File]OPR Template - BCxA
https://info.5y1.org/hvac-start-up-checklist-forms_1_180fa9.html
Mar 01, 2016 · HVAC related IEQ goals and requirements are listed in the HVAC section. Interaction with building operations personnel. Describe the interface that occupants will have with operations and maintenance personnel to voice concerns over IEQ and related issues (e.g., direct to facility manager’s office, front receptionist, internal company ...
[DOC File]Form 11.01 - Initial Inspection Checklist, Part 1
https://info.5y1.org/hvac-start-up-checklist-forms_1_9bcd56.html
Faulty or non-code compliant HVAC systems or the absence of adequate heating and cooling systems; ... I understand that I will be given the opportunity to review the Work Write-Up and indicate approval with my signature. The Contract Administrator has also explained that I will participate in a Pre-Construction Conference prior to the start of ...
[DOC File]TURN OVER PACKAGE GUIDE - Colarelli Construction
https://info.5y1.org/hvac-start-up-checklist-forms_1_08a6a8.html
B. Pre Start-up checklist: includes data on control set-up, field adjustments. C. On-Site Operational Test: if applicable, supplier performs and documents on-site performance tests. 6.3.1.5 Drawing List . A. Equipment Arrangement / Layouts . B. Piping and Instrumentation Diagram . 1.Recommended Utility Requirements. a.Layout b.Flow rates. 2 ...
[DOC File]Model Commissioning Plan--Design Phase
https://info.5y1.org/hvac-start-up-checklist-forms_1_939576.html
The word pre-functional refers to before functional testing. Pre-functional checklists augment and are combined with the manufacturer’s start-up checklist. The CxA does not witness much of the pre-functional check-listing, except for testing of larger or more critical pieces of equipment and some spot-checking. 3.2.5.1 Start-up Plan. A.
SECTION 260800 - COMMISSIONING OF ELECTRICAL SYSTEMS
The test procedures and forms for more static components like panel boards, switch gear, circuit breakers, transformers, etc., can be more checklist-like in format. For each piece of equipment, checks and test procedures and their documentation record forms may be different documents or combined in the same document, but checks and tests should ...
[DOC File]COMMISSIONING CHECKLIST
https://info.5y1.org/hvac-start-up-checklist-forms_1_c3b68a.html
Mar 11, 2010 · COMMISSIONING CHECKLIST - 4. RETRO-COMMISSIONING. Main Items Included in Scope. Required Options. Selected Compressed air system Steam condensate system Hot water heating system Computer room HVAC system Chemical water treatment system Chillers Cooling towers Air terminal unit systems, VAV, PIU, AHU, etc. Humidifiers and controls Dampers