Install treads or risers first

    • [DOCX File]SECTION 32 05 23 - CEMENT AND CONCRETE FOR EXTERIOR ...

      https://info.5y1.org/install-treads-or-risers-first_1_786a18.html

      Precast Terrazzo Stair Units: Use epoxy adhesive to install [treads,] [risers,] [and] [landings] over steel substrates according to ANSI 108.6. REPAIR Terrazzo Contractor shall repair terrazzo areas that evidence lack of bond between topping and underbed according to NTMA’s written recommendations.

      riser on top of tread


    • [DOCX File]SECTION 32 05 23 - CEMENT AND CONCRETE FOR EXTERIOR ...

      https://info.5y1.org/install-treads-or-risers-first_1_5b3d2b.html

      Stair Treads: 12” (300 mm) length wide sample [tread/riser] [flat tread[ with riser]] units including cast-in nosing. Coordination drawings are necessary when limited space necessitates maximum utilization for efficient installation of different components or when the work of several different trades will need to be coordinated with the ...

      stair tread to riser ratio


    • SECTION 055100 - METAL STAIRS

      Risers: Smooth, flat, [coved-toe, 7 inches (178 mm) high by length matching treads] [toeless, height and length to cover risers]; produced by same manufacturer as treads and recommended by manufacturer for installation with treads.

      installing stair risers


    • [DOC File]09 66 23.13

      https://info.5y1.org/install-treads-or-risers-first_1_622e23.html

      Install construction joint whenever concrete placement is suspended for more than 30 minutes and at end of each day's work. ... uniform finish to treads, risers and sidewall. Risers and Sidewall: Brush finish. ... with maximum coverage of 11 sq. m/L (50 sq. yds./gal.) for first coat, and maximum 16 sq. m/L (70 sq. yds./gal.) for second coat ...

      riser tread formula


    • [DOC File]DIVISION - SCOPE OF WORK - City of New York

      https://info.5y1.org/install-treads-or-risers-first_1_518aeb.html

      Step Treads, Risers and Sidewalls: Finish as specified for pedestrian pavement, except as follows: Remove riser forms sequentially, starting with top riser. Rub …

      do you install risers or treads first


    • [DOC File]SECTION 096513 - RESILIENT BASE AND ACCESSORIES

      https://info.5y1.org/install-treads-or-risers-first_1_ded88b.html

      Install stair treads and nosing’s in accordance with the governing regulations, the industry standards applicable to the work and the manufacturer’s written instructions Align work plumb, level and where required, flush with adjacent surfaced and rigidly anchored to the substrate.

      installing risers on open stairs


    • [DOC File]09 66 23.16 - Precast Terrazzo

      https://info.5y1.org/install-treads-or-risers-first_1_f6ddad.html

      Form treads of 1/4 inch (6 mm) thick steel floor plate with integral nosing and back edge stiffeners. Weld steel supporting brackets to stringers, and treads to brackets. Fabricate platforms of steel floor plate of the thickness shown.

      code requirements for stair treads and risers


    • [DOC File]Nystrom STN Spec.doc

      https://info.5y1.org/install-treads-or-risers-first_1_107921.html

      Precast Terrazzo Stair Units: Use epoxy adhesive to install [treads,] [risers,] [and] [landings] over steel substrates according to ANSI 108.6. REPAIR Terrazzo Contractor shall repair terrazzo areas that evidence lack of bond between topping and underbed according to NTMA’s written recommendations.

      how to install stair treads and risers


    • Should You Install Stair Treads or Risers First?

      Provide and install new exterior steel stair including steel stair assemblies, diamond plate platform and treads, (open risers) metal handrails, channel supports, footings, etc. Shop prime all metal. SECTION 055213 - PIPE AND TUBE RAILINGS

      riser on top of tread


Nearby & related entries: