Njdot bid results

    • [DOC File]THE FOLLOWING NEW SECTION IS ADDED:

      https://info.5y1.org/njdot-bid-results_1_967279.html

      A report to document these results shall be provided to the NJDOT Regional Materials Office. The Contractor shall obtain the results of these standard tests from an AASHTO Accredited testing agency, that is approved for Portland Cement …

      njdot awarded bids


    • [DOC File]SI2007 - New Jersey

      https://info.5y1.org/njdot-bid-results_1_9443fb.html

      Apr 30, 2020 · 9. Submission of a materially unbalanced bid. A materially unbalanced bid is a bid where there is a reasonable doubt that award to the Bidder submitting a mathematically unbalanced bid, which is structured on the basis of nominal prices for some work and inflated prices for other work, will result in the lowest ultimate cost to the Department. 10.

      njdot awarded contracts


    • [DOC File]Edition 2009 - New Jersey

      https://info.5y1.org/njdot-bid-results_1_61723a.html

      M = Percentage of Bid Price Applicable to Materials Only: Use 82%. ... the staging of the project results in less than 2,500 feet of continuous paving. ... The Laboratory will determine the maximum specific gravity of the mix according to NJDOT B-3 and AASHTO T 209, except that minimum sample size may be waived in order to use a 6-inch diameter ...

      njdot bid prices


    • [DOC File]SI2007

      https://info.5y1.org/njdot-bid-results_1_4862b7.html

      Jul 15, 2016 · 102.01 Qualification to Bid. 1*****1. BDC14s-09 dated aug 15, 2014. second criteria is changed to: 2. Before the receipt of the bid or accompanying the bid, the Bidder has disclosed ownership as required by N.J.S.A. 52:25-24.2.

      njdot current solicitations


    • [DOC File]Elevator Maintenance Agreement and Specifications

      https://info.5y1.org/njdot-bid-results_1_1ee893.html

      1.02.08 A statement showing Contractor's capabilities to provide bid and/or performance bonds. Any limitations of bonds shall be outlined. 1.02.09 A description of any other factors that will strengthen Contractor's position to be considered as an approved bidder on this project.

      njdot construction services


    • [DOCX File]SI2019

      https://info.5y1.org/njdot-bid-results_1_c7a84e.html

      For Federal Aid Projects exceeding a bid amount of $100,000 or more, Bidder shall certify to the Byrd Anti For Federal Aid Projects exceeding a bid amount of $100,000 or more, Bidder shall certify to the Byrd Anti-Lobbying Act requirements under 31 USC 1352 For Federal Aid Projects exceeding a bid amount of $100,000 or more, Bidder shall certify to the Byrd Anti-Lobbying Act …

      njdot construction awards


    • [DOC File]SPECIFICATION - Government of New Jersey

      https://info.5y1.org/njdot-bid-results_1_db31ff.html

      Apr 26, 2016 · D. Bids must be received by the New Jersey Department of Transportation (NJDOT) before the closing date and time, as stated on the Informal Bid Proposal Form. Public Works Bidders are required to be registered with the Department of Labor, Contractor Registration Unit at the time of the bid due date.

      njdot pay item list


    • [DOCX File]Date: December 6, 2016

      https://info.5y1.org/njdot-bid-results_1_31c9d0.html

      C.Any oral interpretation, not documented in writing prior to bid opening or referenced in the bid proposal, shall be considered as privileged information and, as such, not binding upon the NJDOT. D.Conditions existing at the time of the inspection will be maintained by the NJDOT …

      njdot bid price report


    • [DOC File]SPECIFICATION - New Jersey

      https://info.5y1.org/njdot-bid-results_1_a7bdaa.html

      Please see attached NJDOT Safety Standard Operating Procedure, “Contractor Safety Requirements” for more information. Award. A. Award of contract will be based upon the lowest responsible bid. The New Jersey Department of Transportation (NJDOT) reserves the right to reject all bids. Results of the bidding will be made available upon request.

      njdot awarded bids


    • [DOC File]New Jersey Department of Transportation

      https://info.5y1.org/njdot-bid-results_1_665bb8.html

      If none of the non-core test results is below the class design strength, the Engineer may elect either to core or to accept the lot at 100 percent payment. If, based on the core results, the lot is determined to be at a quality level of PD < 75, the pay-adjustment shall be computed by Equation 1 or Equation 2, as appropriate.