Previously purchased items

    • [DOC File]What is recovery - FEMA

      https://info.5y1.org/previously-purchased-items_1_aedee8.html

      The federal government has tried to solve this problem by requiring flood insurance for structures located in the 100 year flood plain that are purchased with federally backed mortgages. Unfortunately, homeowners frequently allow their policies to lapse after the first year and the program has no effect on those who purchase their homes without ...


    • [DOCX File]CHECKLIST ITEMS AND EXPLANATIONS

      https://info.5y1.org/previously-purchased-items_1_a66664.html

      Contracting can advise whether the desired goods or services can be best purchased by the contracting office or by another agency using a MIPR. ... regulations and directives (e.g. requirement of DFARS 225.7002-1 that certain items procured with DoD funds be of domestic origin). ... Insert the following if the work was previously performed by ...


    • Price Guide 2020-21 - NDIS

      Jul 08, 2020 · Core - Assistance with Social, Economic and Community Participation. Price Guide 2020-21 - Version 1.0.7 (published 27/08/2020) Page 58 of 105. Price Guide 2020-21 Version 1.0.7 (published 27/08/2020) Page 57 of 105


    • [DOC File]gar003, Chapter 3 Systems Design: Job-Order Costing

      https://info.5y1.org/previously-purchased-items_1_b5d54e.html

      This raw material was purchased to use in a product line that has been discontinued. Material L can be sold as is for scrap for $1.67 per kilogram. An alternative would be to use material L in one of the company’s current products, Q08C, which currently requires 2 kilograms of a raw material that is available for $9.15 per kilogram.


    • [DOC File]Pamphlet 26-7 Chapter 10 - Veterans Affairs

      https://info.5y1.org/previously-purchased-items_1_8ed9c2.html

      Note: In most cases for HUD Form 92541 to be acceptable, it must have the identifying information at the top completed, as well as Items 2 and 4 or Items 5, 6, 9, 10, 12 and 13. Continued on next page 10.10 Construction Exhibits, Continued. Number and Distribution of Exhibit Sets If inspections during construction are to be made by


    • [DOC File]Chapter 9—Product Concepts

      https://info.5y1.org/previously-purchased-items_1_8884ec.html

      6. If a retail outlet does not offer all the items necessary in order for the buyer to use or to receive full satisfaction from a product purchased there, there is a: a. discrepancy of assortment b. discrepancy of quantity c. spatial discrepancy d. temporal discrepancy e. discrepancy of possession ANS: A PTS: 1 REF: 172 OBJ: 12-1 TYPE: Def


    • Price Guide 2020-21

      Nov 17, 2020 · In general, support items subject to price controls have a single national price limit. However, some Capacity Building supports have two price limits: one for New South Wales, Victoria, Queensland and the Australian Capital Territory; and a different price limit for South Australia, Western Australia, Tasmania and the Northern Territory.


    • [DOC File]Prosthetics Section II - Arkansas

      https://info.5y1.org/previously-purchased-items_1_43d3cc.html

      Repair of “purchased” items is covered separately. Total (cumulative) repair costs must not exceed 50% of the item’s total purchase cost. 242.110 Respiratory and Diabetic Equipment, All Ages 11-1-17 When billed either electronically or on paper, procedure codes …


    • [DOCX File]JUSTIFICATION AND APPROVAL

      https://info.5y1.org/previously-purchased-items_1_8d8ea6.html

      Guidance regarding use of this authority is at FAR 6.302-5. It applies when statute expressly authorizes or requires the acquisition to be made through another agency or from a specified source. It may also be used when brand name commercial items are purchased for …


    • [DOCX File]SI2019 - State

      https://info.5y1.org/previously-purchased-items_1_4200da.html

      Mar 24, 2021 · Ensure that FHWA category 1, 2, 3, and 4 traffic control devices (TCDs) conform to the requirements of the 2016 Edition of the Manual for Assessing Safety Hardware (MASH), except that TCDs manufactured on or before December 31, 2019 must have been purchased by the Contractor on or before December 31, 2019, and conform to the requirements of ...


Nearby & related entries: