Red calc ashrae 62 2 2013
[DOC File]PUC - PUC Home Page
https://info.5y1.org/red-calc-ashrae-62-2-2013_1_d4ad75.html
Table 2 63: High Efficiency Pool and Motor – Two Speed Pump Calculations Assumptions 143. Table 2 64: Two-Speed Pool Pump Deemed Savings Values 144. Table 2 65: Residential VFD Pool Pumps Calculations Assumptions 146. Table 2 66: Single Speed Pool Pump Specification 147. Table 3 2: Lighting Power Densities from ASHRAE 90.1-2007 Space-by-Space ...
[DOCX File]CHAPTER 1: SCOPE AND ADMINISTRATION (Unique to MA) - …
https://info.5y1.org/red-calc-ashrae-62-2-2013_1_f12edf.html
Jun 23, 2015 · For applications for reconstruction, rehabilitation, addition, alteration, repair or other improvement of existing buildings or structures located in a flood hazard area as established by Section 322.1.1, the building official shall examine or cause to be examined the construction documents and shall make a determination with regard to the value of the proposed work.
[DOC File]FUS-0435*; P-00981628.O; Citizens Tel. Co. of New York
https://info.5y1.org/red-calc-ashrae-62-2-2013_1_859c32.html
Table 2 49: Deemed coincident demand savings for ENERGY STAR Version 4.1 and 5.1 TVs. 119. Table 3 1: Usage Groups Recommended per Building Type 128. Table 3 2: Hours of Use for Usage Groups 128. Table 3 3: Lighting Power Densities from ASHRAE 90.1-2007 Building Area Method 131
[DOC File]New Jersey Clean Energy Collaborative
https://info.5y1.org/red-calc-ashrae-62-2-2013_1_71f7f4.html
Aug 04, 2010 · 2 Time Period Allocation Factors Fixed Summer = 50%. Winter = 50%. 3 GsavSHW Fixed 130.27 4 Sources: Federal EPACT Standard for a 40 gallon gas water heater. Calculated as 0.62 – (0.0019 X gallons of capacity). KEMA. NJ Clean Energy …
[DOC File]Design-Build (DB) Request for Proposal (RFP) Template
https://info.5y1.org/red-calc-ashrae-62-2-2013_1_5a473b.html
2.1.1 Scope of Work and Project Summary/Requirements 9. 2.1.2 Definition of Contract Line Items 9. 2.1.3 Progress Payments 10. 2.1.4 Project Meetings 10. 2.1.5 Project Schedule 12. 2.2 Design Requirements 15. 2.2.1 DB Design Development and Construction Documents 15. 2.2.2 Environmental and Sustainability Requirements for Design 17
[DOCX File]PUC - PUC Home Page
https://info.5y1.org/red-calc-ashrae-62-2-2013_1_c1a115.html
These proposed new and more detailed EFLH tables would affect the following sections of the 2013 TRM: Section 2.1 – Electric HVAC, Section 2.5 – Furnace Whistle, Section 2.11 – Programmable Thermostat, Section 2.17 – Ductless Mini-Split Heat Pumps, Section 2.20 – Fuel Switching: Electric Heat to Gas Heat and Section 2.21 – Ceiling ...
[DOC File]New Jersey Clean Energy Collaborative
https://info.5y1.org/red-calc-ashrae-62-2-2013_1_d2fb31.html
Component Type Situation Value Source IPLVb (kW/ton) Fixed Air Cooled with Condenser (All) 1.153 ASHRAE 90.1-2007 Air Cooled w/o Condenser (All) 1.019 Water Cooled, reciprocating 0.696 ASHRAE 90.1-2007 Water Cooled (300 tons) 0.572 ASHRAE 90.1 ...
Nearby & related entries:
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Hot searches
- service plans office 365 description
- good second income sources
- animal trivia questions for seniors
- municipal bond repayment schedule calculator
- cool homemade projects
- comcast home phone and internet
- av graft malfunction icd 10
- apc ups 5000 specifications
- rash in between finger
- average income by occupation in america