Red calc ashrae 62 2 2013

    • [DOC File]PUC - PUC Home Page

      https://info.5y1.org/red-calc-ashrae-62-2-2013_1_d4ad75.html

      Table 2 63: High Efficiency Pool and Motor – Two Speed Pump Calculations Assumptions 143. Table 2 64: Two-Speed Pool Pump Deemed Savings Values 144. Table 2 65: Residential VFD Pool Pumps Calculations Assumptions 146. Table 2 66: Single Speed Pool Pump Specification 147. Table 3 2: Lighting Power Densities from ASHRAE 90.1-2007 Space-by-Space ...

      ashrae red calculator


    • [DOCX File]CHAPTER 1: SCOPE AND ADMINISTRATION (Unique to MA) - …

      https://info.5y1.org/red-calc-ashrae-62-2-2013_1_f12edf.html

      Jun 23, 2015 · For applications for reconstruction, rehabilitation, addition, alteration, repair or other improvement of existing buildings or structures located in a flood hazard area as established by Section 322.1.1, the building official shall examine or cause to be examined the construction documents and shall make a determination with regard to the value of the proposed work.

      ashrae 62.2 ventilation calculator


    • [DOC File]FUS-0435*; P-00981628.O; Citizens Tel. Co. of New York

      https://info.5y1.org/red-calc-ashrae-62-2-2013_1_859c32.html

      Table 2 49: Deemed coincident demand savings for ENERGY STAR Version 4.1 and 5.1 TVs. 119. Table 3 1: Usage Groups Recommended per Building Type 128. Table 3 2: Hours of Use for Usage Groups 128. Table 3 3: Lighting Power Densities from ASHRAE 90.1-2007 Building Area Method 131

      red calc ashrae 62.2 2016


    • [DOC File]New Jersey Clean Energy Collaborative

      https://info.5y1.org/red-calc-ashrae-62-2-2013_1_71f7f4.html

      Aug 04, 2010 · 2 Time Period Allocation Factors Fixed Summer = 50%. Winter = 50%. 3 GsavSHW Fixed 130.27 4 Sources: Federal EPACT Standard for a 40 gallon gas water heater. Calculated as 0.62 – (0.0019 X gallons of capacity). KEMA. NJ Clean Energy …

      ashrae 62.2 calculation sheet


    • [DOC File]Design-Build (DB) Request for Proposal (RFP) Template

      https://info.5y1.org/red-calc-ashrae-62-2-2013_1_5a473b.html

      2.1.1 Scope of Work and Project Summary/Requirements 9. 2.1.2 Definition of Contract Line Items 9. 2.1.3 Progress Payments 10. 2.1.4 Project Meetings 10. 2.1.5 Project Schedule 12. 2.2 Design Requirements 15. 2.2.1 DB Design Development and Construction Documents 15. 2.2.2 Environmental and Sustainability Requirements for Design 17

      ashrae 62.2 2016 calculator


    • [DOCX File]PUC - PUC Home Page

      https://info.5y1.org/red-calc-ashrae-62-2-2013_1_c1a115.html

      These proposed new and more detailed EFLH tables would affect the following sections of the 2013 TRM: Section 2.1 – Electric HVAC, Section 2.5 – Furnace Whistle, Section 2.11 – Programmable Thermostat, Section 2.17 – Ductless Mini-Split Heat Pumps, Section 2.20 – Fuel Switching: Electric Heat to Gas Heat and Section 2.21 – Ceiling ...

      ashrae 62.2 2013 pdf


    • [DOC File]New Jersey Clean Energy Collaborative

      https://info.5y1.org/red-calc-ashrae-62-2-2013_1_d2fb31.html

      Component Type Situation Value Source IPLVb (kW/ton) Fixed Air Cooled with Condenser (All) 1.153 ASHRAE 90.1-2007 Air Cooled w/o Condenser (All) 1.019 Water Cooled, reciprocating 0.696 ASHRAE 90.1-2007 Water Cooled (300 tons) 0.572 ASHRAE 90.1 ...

      ashrae 62.2 2016 ventilation requirements


Nearby & related entries: