      Each production threshold value should be determined on the basis of manufacturing risk and risk imposed by other related attributes. KPP and non-KPP threshold values in the CPD should be equal to or better than the corresponding CDD threshold values. There may be cases, however, where CDD KPP and/or non-KPP threshold values are reduced in a CPD.


    • [DOCX File]Preliminary Project Execution Plan

      https://info.5y1.org/threshold-and-objectives-kpp_1_5be4ef.html

      Sustainment objectives are set in the Materiel Solution Analysis (MSA) phase of the program’s Life Cycle, and then transformed into outcomes through compliance with the Key Performance Parameter (KPP)/Key Sustainment Attributes (KSAs) and TPMs. ... A system’s failure to meet a validated KPP threshold (i.e., minimum acceptable performance ...


    • [DOC File]OPERATIONAL REQUIREMENTS DOCUMENT TEMPLATE

      https://info.5y1.org/threshold-and-objectives-kpp_1_52819d.html

      OBJECTIVES: At the completion of this block of instruction, the participant will be able to: Recognize basic requirements generation terminology and concepts, including interoperability, KPP, threshold, objective, and IER. Be familiar with the general attributes of well-written requirements.


    • Measures of Effectiveness for Supportability

      Use Threshold/Objective format and provide criteria and rationale for each requirement. 4.2. Key Performance Parameters (KPPs) The KPPs are those attributes or characteristics of a system which are considered critical or essential. Failure to meet a KPP threshold value could be the basis to reject a system solution. 4.3 System Performance.


    • [DOC File]Master LCSP Template

      https://info.5y1.org/threshold-and-objectives-kpp_1_f86906.html

      Operational Test and Evaluation Objectives - State the test objectives including the COIs to be addressed during remaining OT&E and the Acquisition Decision Events (ADEs) supported. OT&E which supports the Production and Deployment Decision (ADE 3) should have test objectives that examine all areas of operational effectiveness and suitability.


    • [DOC File]DHS-APB

      https://info.5y1.org/threshold-and-objectives-kpp_1_1dc785.html

      The OBPMs should measure the value-added contribution of the IT investment to missions, goals, and objectives and provide a clear basis for assessing accomplishment and aiding decision-making. This requires the collection of performance data and comparing actual to projected performance from carrying out a program or activity, thereby ...


    • Key Performance Parameters - Wikipedia

      Note: The threshold KPPs are the minimum parameters against which the project’s performance is measured when complete. At CD-2, the documented threshold KPPs comprises the official Performance Baseline. Objective KPPs are those additional parameters that will be …


    • [DOC File]Slide 1

      https://info.5y1.org/threshold-and-objectives-kpp_1_b8bede.html

      The goal is a performance level that the Technology Development project is striving for, and the threshold is the minimum performance level that users agree is acceptable for the end item deliverable. Typically, the threshold KPP values are set beyond the current state of the art to warrant investment in the Technology Development project.


    • [DOCX File]MANUAL FOR THE OPERATION OF THE JOINT CAPABILITIES …

      https://info.5y1.org/threshold-and-objectives-kpp_1_b22780.html

      The Original Estimates are the KPP Objective and Threshold values provided to Congress in the Critical Change Report. Current Estimates: In all cases, the Current Estimates are the actual values or the Program Manager’s estimate thereof as of the President’s Budget being prepared.


    • [DOC File]2012 MAR Preparation Guidance for preparing the Pre-Major ...

      https://info.5y1.org/threshold-and-objectives-kpp_1_a20502.html

      3.0 Sustainment Performance Requirements: Describe all sustainment performance requirements (e. g. sustainment KPP/KSA metrics, manpower constraints, footprint, etc.) including the definition, threshold/objective range and either its current projected value or actual measured value.