Warranty bond vs performance bond

    • [DOC File]A/E Submission Instructions - RFP Design Build Projects

      https://info.5y1.org/warranty-bond-vs-performance-bond_1_683aea.html

      c. Develop RFP performance specifications to establish the quality of products and workmanship. Performance specifications shall be used to encourage full and open competition. Reference to equipment, materials, or patented processes by trade name, make, and catalog number shall be regarded as establishing a standard of quality only and shall ...

      warranty bond vs maintenance bond


    • [DOCX File]SECTION 04 20 00 - UNIT MASONRY - Veterans Affairs

      https://info.5y1.org/warranty-bond-vs-performance-bond_1_47f6f0.html

      Pattern Bond: Lay exterior wythes in pattern bond shown, or if not shown, lay in 1/2 running bond with vertical joints in each course centered on units in courses above and below. Lay inner wythes (if any) with units in each wythe bonded by lapping minimum 50 mm (2 inches). Bond and interlock each course of each wythe at corners and intersections.

      payment bond vs performance bond


    • [DOC File]OverKote® Asphalt Pavement Coating

      https://info.5y1.org/warranty-bond-vs-performance-bond_1_d1d1e0.html

      bond between the asphalt pavement and sealer may be questionable. 5.0 EQUIPMENT 5.1 Mixing or agitating equipment furnished shall be a tank-type power mixer with a round bottom and equipped with a power driven mixer of sufficient capacity to maintain the mineral content in complete suspension.

      bank guarantee vs performance bond


    • [DOCX File]Prohibited Items, Items That Often Require Pre-Purchase ...

      https://info.5y1.org/warranty-bond-vs-performance-bond_1_a2a127.html

      Prohibited Items, Items That Often Require Pre-Purchase Approval, and Fiscal Law Issues. Prohibited Items. Cash advances-Money orders, travelers’ checks, and gift certificates are also considered to be cash advances and will not be purchased by Cardholders, even to obtain items from merchants who do not accept the GPC.

      performance and maintenance bond


    • [DOCX File]DB Contract - Vs 07-01-2011

      https://info.5y1.org/warranty-bond-vs-performance-bond_1_d3aacb.html

      (7)Further, this bond shall be the Performance Bond furnished under O.C.G.A. §§ 13-10-2, 13-10-20 and shall be subject to increase in the penal amount of the bond pursuant to …

      construction warranty bond


    • [DOCX File]Air Force Compliance Inspection Checklist

      https://info.5y1.org/warranty-bond-vs-performance-bond_1_728755.html

      Does the BAA, together with any supporting documents, (1) Describe the agency’s research interest; (2) Describe the criteria for selecting the proposals, their relative importance, and the method of evaluation; (3) Specify the period of time during which proposals submitted in response to the BAA will be accepted; and (4) Contain instructions for the preparation and submission of proposals?

      what is a warranty bond


    • [DOCX File]Memorandum for General RFP Configuration

      https://info.5y1.org/warranty-bond-vs-performance-bond_1_f48818.html

      The letter of credit/performance bond shall cover the entire contract period, with the exception of post-warranty maintenance and support, and shall not be released until final acceptance of all products and deliverables required herein or until the warranty period, if any, has expired, whichever occurs last.

      warranty bond example


    • [DOCX File]14. Shipping and Delivery - Department of Enterprise Services

      https://info.5y1.org/warranty-bond-vs-performance-bond_1_9c6418.html

      Iowa specific terms reference a performance bond, but no detail is provided. Will a performance bond be required for this contract, if so, in what amount? A2.This RFP does not require a performance bond.

      maintenance bond vs performance bond


    • [DOCX File]07 92 00 Joint Sealant and Expansion Joint Systems

      https://info.5y1.org/warranty-bond-vs-performance-bond_1_3453be.html

      Bond Breaker – Material such as tape or backer rod designed to prevent three-sided adhesion. Backer Rod – Flexible foam used behind sealant to increase elasticity, control the thickness and configuration of the sealant and provide a bond breaker to prevent three-sided adhesion.

      warranty bond vs maintenance bond


    • [DOC File]Stucco Manufacturers Association guide specificationiton

      https://info.5y1.org/warranty-bond-vs-performance-bond_1_478250.html

      An “engineered performance mix” by an SMA manufacturer is acceptable with appropriate approvals (ICC ES, IAPMO or Interek report) . Water: Clean and potable without foreign matter. [An optional SMA approved admixture may be added to impart increased tensile, bond, …

      payment bond vs performance bond


Nearby & related entries: