The Performance Measurement Baseline (PMB) is the agreed to plan for executing the program. Variances from the plan are expected to occur because the PMB and actual execution normally differ. Variance analysis provides information on:
[DOC File]HHS EVM Process and Procedures
https://info.5y1.org/what-is-performance-measurement-baseline_1_8654ab.html
Performance Measurement Baseline (PMB) The PMB is the time-phased budget plan against which contract performance is measured. It is formed by the budgets assigned to scheduled cost accounts and the applicable indirect budgets. It equals the total budget less …
[DOCX File]New Jersey DSRIP Performance Measurement Databook
https://info.5y1.org/what-is-performance-measurement-baseline_1_6dc51c.html
– The time period for which the first measurement will be computed. Future performance will then be compared against the baseline period. Each measure specification sheet indicates the baseline period. For MMIS measures, 2016 data will be utilized to set the …
[DOCX File]Background - | US Department of Transportation
https://info.5y1.org/what-is-performance-measurement-baseline_1_fa0de1.html
The Recipient shall submit to the USDOT, on or before the Pre-project Report Date that is stated in Attachment D, a Pre-project Performance Measurement Report that contains: (1)baseline data for each performance measure that is identified in the Performance Measurement Table in Attachment D, accurate as of the Pre-project Measurement Date that ...
[DOC File]EVM CONTRACT REQUIREMENTS CHECKLIST
https://info.5y1.org/what-is-performance-measurement-baseline_1_998d96.html
Integrated Baseline Reviews (IBRs). The contractor shall engage jointly with the Government’s program manager in Integrated Baseline Reviews (IBRs) to evaluate the risks inherent in the contract’s planned performance measurement baseline.
[DOC File]CONTRACT DATA REQUIREMENTS LIST - AcqNotes
https://info.5y1.org/what-is-performance-measurement-baseline_1_fc66f2.html
Block 4: Reporting Levels: Format 1 reporting shall be at Level 3 of the Contract Work Breakdown Structure (CWBS), but lower levels may be required for CWBS Elements at Level 3 that are greater than 20% of total Performance Measurement Baseline (PMB) budget.
NDIA PMSC ANSI/EIA-748 EVMS Intent Guide
When the performance budget or schedule objectives exceed the project plan and are recognized in the performance measurement baseline, it is identified as an over-target baseline (OTB). The decision to establish an over-target baseline may result due to planning future work, planning in-process work, and/or adjusting cost or schedule variances.
[DOC File]Earned Value Management Systems Consultants: EVMS ...
https://info.5y1.org/what-is-performance-measurement-baseline_1_721405.html
The Performance Measurement Baseline is derived from the Solution Implementation approved segment of the Lifecycle Cost. EVM Performance Measurement Baseline (PMB): The Performance Measurement Baseline (PMB) is the time-phased plan established by the PM for executing the JRC approved program for EVM Performance.
[DOCX File]IBR Handbook (SP-3406)
https://info.5y1.org/what-is-performance-measurement-baseline_1_df7ba4.html
The purpose of the review is to achieve a mutual understanding of the Performance Measurement Baseline (PMB) and its relationship to the Earned Value Management System (EVMS) and management processes. The objectives are to gain insight into cost and schedule risk associated with the contracted effort and to establish confidence in the project ...
[DOC File]ED 524-B Form: Grant Performance Report Instructions ...
https://info.5y1.org/what-is-performance-measurement-baseline_1_1b3bb3.html
For performance measures that are stated in terms of a single number (e.g., the number of workshops that will be conducted or the number of students that will be served), the target and actual performance data should be reported as a single number under the Raw Number column (e.g., 10 workshops or 80 students). ... If baseline data for a ...