Yard of concrete coverage
Concrete for minor structures - USDA
Maintain the following concrete coverage for concrete reinforcing: ... and the volume of concrete is computed to the nearest 0.1 cubic yard. No deduction in volume is made for chamfers or edges. Payment for each item of concrete is made at the contract unit price for that item. The payment for concrete will constitute full compensation for ...
[DOCX File]Voorhees Township Zoning Board Minutes January 28, 2016
https://info.5y1.org/yard-of-concrete-coverage_1_ade343.html
Mr. Norman summarized the case stating the Applicant seeks approval for the following 3 bulk( c) variances: 1) rear-yard lot coverage (25% permitted; 52% proposed) to permit concrete decking surrounding an inground swimming pool improvement; 2) setback variances for concrete decking (15 feet required; 11.22 feet to rear property line, and 8.04 feet and 12.82 feet from two side property lines ...
[DOC File]Class S Concrete for New Bridge Decks with Warranty
https://info.5y1.org/yard-of-concrete-coverage_1_afd0b7.html
893.03 Warranty Items Coverage. 893.04 Traffic Control. 893.05 Annual Review Process. 893.06 Remedial Action. 893.07 Appeal Process. 893.08 Method of Measurement. 893.09 Basis of Payment. 893.01 General. This item consists of furnishing and placing Class S concrete for new bridge decks in conformance with Item 511 except as modified herein.
[DOCX File]DEPARTMENT OF ECOLOGY AIR QUALITY PROGRAM
https://info.5y1.org/yard-of-concrete-coverage_1_d9a4be.html
Fill out the form completely in order to obtain coverage. Read the Portable and Stationary Concrete Batch Plant General Order. ... (Actual annual concrete production cannot exceed 74,500 cubic yards for in-transit mix plants or 246,000 cubic yards for central mix plants.) ... (A cubic yard of concrete approximately equals 2 tons) 7. Power Source:
Pervious Concrete
Line: Pervious concrete margins shall be true to designed lines plus or minus ½ inch at any point. Slope: Pervious concrete shall be sloped as shown on the Plans. Slope shall be consistent to within 1/4 inch in ten (10) feet. Thickness: Each core sample shall be equal to the minimum section depth or more as specified on the Plans.
[DOC File]Permit Reviewer:
https://info.5y1.org/yard-of-concrete-coverage_1_d4251a.html
Lot coverage 2%. At front building line 300 feet. Front yard setback 50 feet. Side yard setback 40/20 feet (40 feet total for both side yards/20 feet minimum of either yard) Rear yard 20 feet. Maximum height 35 feet
[DOCX File]Concrete Panel Facing MSE WALL SPECS
https://info.5y1.org/yard-of-concrete-coverage_1_69255d.html
Concrete for the leveling pad shall be Concrete (Class D) conforming to the requirements of Section 601. Unless specified on the plans, the maximum vertical step shall be no greater than 36 inches. ... For small local coverage areas, less than 30 square feet, the membrane may be spliced using a 6 inch minimum overlap and an adhesive or a single ...
[DOC File]DEP5033 Form - RLA - Municipal Solid Waste Collector and ...
https://info.5y1.org/yard-of-concrete-coverage_1_52699b.html
Routes/Coverage Area 9. Number of Households Served 10. Number of Businesses Number of industrial facilities 11. ... Yard Waste Pick-Up $ ... Aluminum Cans Tons Antifreeze/Ethyl Glycol Gallons Asphalt Tons Cardboard Tons Cloth Tons Concrete Tons Electronic Scrap Tons Glass Tons Lead Acid Batteries Each Metal, Ferrous (Steel, White Goods) Tons ...
[DOCX File]Concrete Block Facing MSE WALL SPECS
https://info.5y1.org/yard-of-concrete-coverage_1_1d118a.html
Concrete tensile stress shall not exceed the modulus of rapture. Report shall include calculations of facing cracking stress according to the proposed method of lifting and shipping. Before shipping from precast yard to wall site, the Engineer will approve the time of shipping, method of lifting and supporting condition during shipping.
[DOC File]MATCRETE® Dustone Color Hardener™ Guide Specifications
https://info.5y1.org/yard-of-concrete-coverage_1_738458.html
MATCRETE® Dustone Color Hardener™ is an engineered blend of color pigments, cement graded, hard non-reactive aggregates and surface conditioning agents. Only pure, lightfast, lime proof and weather resistant pigments are used. Dustone Color Hardener is a ready to use dry-shake colorant and hardener for concrete. Applied to fresh concrete, it will produce a colorful, wear resistant concrete ...
[DOCX File]Nssp 24-3 Cement Stabilized Soil
https://info.5y1.org/yard-of-concrete-coverage_1_cca011.html
3.Construct a 1,000-square yard test strip of CSS demonstrating ability to comply with the specifications. 4.Obtain the Engineer's authorization. 24-3.01D(2) Preparing Basement Material ... Finish rolling of trimmed surfaces must be performed with at least 1 complete coverage with steel drum or pneumatic-tired rollers within 2 hours of ...
[DOC File]MATCRETE® Dustone Color Hardener™ Stamping Guide ...
https://info.5y1.org/yard-of-concrete-coverage_1_e3354b.html
Avoid placing concrete if rain, snow, or frost is forecast within 24-hours. Protect fresh concrete from moisture and freezing. Comply with professional practices described in ACI 305R and ACI 306R. PRE-JOB CONFERENCE. One week prior to placement of concrete, a meeting shall be held to discuss the Project and application methods.
DESIGNER NOTES
The mix shall be formulated with calcium nitrite corrosion inhibitors, which shall be added at a rate of 3 gallons per cubic yard of concrete in order to increase the active corrosion threshold to 9.9 pounds of chloride per cubic yard of concrete at the reinforcing bar level.Prior to production of cement concrete, the Fabricator shall report ...
[DOCX File]SECTION 03 30 00, CAST-IN-PLACE CONCRETE
https://info.5y1.org/yard-of-concrete-coverage_1_599b41.html
Concrete work, judged inadequate by structural analysis, by results of load test, or for any reason, shall be reinforced with additional construction or replaced, if directed by the COR. 2.4 BATCHING AND MIXING. General: Concrete shall be "ReadyMixed" and comply with ACI 318 and ASTM C94, except as specified. Batch mixing at the site is permitted.
[DOC File]ZONING BOARD OF ADJUSTMENT APRIL 8, 2013
https://info.5y1.org/yard-of-concrete-coverage_1_5b15a2.html
Basement entrance will either be in the rear or interior to the house. Will not be in the side yard setback. Mr. Halberstam – all the lots are 75 feet wide. Mr. Lines – there is just a concrete pad at the side door. With a deck they will be at 31% lot coverage. Mr. Halberstam – we will approve 31% lot coverage which will include a 14 x 18 ...
Nearby & related entries:
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.