[Pages:3]TABULATION SHEET Bid No. 20110275360 Contract for the Purchase and Installation of Automotive Shop Equipment and Other Related Accessories Opening Date: 13Dec2010
VENDOR #1 Myers Tire Supply Distribution, Inc.
1293 S. Main St. Akron, OH 44301 Michelle Stroup 972.291.9907 972.293.1068 fax
VENDOR #2 O'Reilly Automotive Inc. dba O'Reilly Auto Parts
233 S Patterson Springfield, MO 65802 Chris George 417.829.5879 800.925.0899 fax
VENDOR #3
DESCRIPTION:
Est.
Qty.
NCTRCA Certified Vendor (M/Wbe) Dallas County Taxpayer? How were you notified?
No Yes and No DC website
Section 1: Specify cost for the Purchase and Installation of Automotive Fluid Dispensing System, Used/Waste Oil Evacuation and Storage Equipment and Other Related Accessories at the Automotive Service Center ? East (ASCEast), as per specifications, general and technical requirements: A. Equipment, Material, and Supplies Cost
B. Total Labor and Installation Cost: C. All other cost associated with this project including overhead: Total Project/Bid Cost (a+b+c):
No Bid This Section
$ $ $ $
Specify the Brand, Make and Manufacturer Model Number of the proposed Automotive Fluid Dispensing System, Used/Waste Oil Evacuation and Storage System:
Specify Manufacture Standard Warranty Coverage Period for the proposed Equipment and Systems Above:
All New Equipment, Parts, Material and Supplies installed in connection with the Entire Project:
Labor and Workmanship to include travel time:
Note: All bidders must included onsite warranty coverage for a period one (1) year from date of final acceptance by Dallas County regardless if offered by the manufacturer or awarded Contractor. The cost of the onsite warranty coverage (parts, labor, material, supplies and travel expenses) must be included in all other cost associated with this bid including overhead cost line for each project.
Specify any additional comments/cost/etc. included with your bid proposal, if applicable:
Specify Time of Completion (include any ordering time for material and supplies): All work under this contract shall be completed within _______ calendar days from the date of approved project schedule.
No Yes DC website
No Bid This Section
$
$
$
$
Section 2: Specify cost for the Purchase and
Installation of Automotive Shop Lift Equipment,
Rolling Jacks and Related Accessories at the
Automotive Service Center ? East (ASCEast), as
per specifications, general and technical
requirements:
A. Equipment, Material, and Supplies Cost
$
B. Total Labor and Installation Cost:
$
C. All other cost associated with this project
$
including overhead:
Total Project/Bid Cost (a+b+c):
$
10,287.00
$
975.00
$
$
11,262.00
$
10,871.00 1,400.00
12,271.00
Page 1 of 3
TABULATION SHEET Bid No. 20110275360 Contract for the Purchase and Installation of Automotive Shop Equipment and Other Related Accessories Opening Date: 13Dec2010
VENDOR #1 Myers Tire Supply Distribution, Inc.
1293 S. Main St. Akron, OH 44301 Michelle Stroup 972.291.9907 972.293.1068 fax
VENDOR #2 O'Reilly Automotive Inc. dba O'Reilly Auto Parts
233 S Patterson Springfield, MO 65802 Chris George 417.829.5879 800.925.0899 fax
VENDOR #3
DESCRIPTION:
Est.
Qty.
Specify the Brand, Make and Manufacturer Model Number of the proposed Lift Equipment:
Rotary SMO114EL2 Open Front 4 Post Lift , Myers #50089
Specify the Brand, Make and Manufacturer Model Number of the proposed Rolling Jacks:
Rotary RJ 7000 Rolling Jack
Rotary SM014EL2 Rotary S100077
Specify any additional comments/cost/etc. included with your bid proposal, if applicable
Specify Time of Completion (include any ordering time for material and supplies): All work under this contract shall be completed within _______ calendar days from the date of approved project schedule.
Specify Manufacture Standard Warranty Coverage Period for the proposed Shop Lifts and Rolling Jacks: All New Equipment, Parts, Material and Supplies installed in connection with the Entire Project: Labor and Workmanship to include travel time:
Note: All bidders must included onsite warranty coverage for a period one (1) year from date of final acceptance by Dallas County regardless if offered by the manufacturer or awarded Contractor. The cost of the onsite warranty coverage (parts, labor, material, supplies and travel expenses) must be included in all other cost associated with this bid including overhead cost line for each project.
Specify the name, address, and telephone number of the service department who will be perform on site warranty service coverage for Section 1 and 2 under this contract
Please answer the questions listed below
Specify Prompt/Early Payment Discount Terms (if any): Did your company check Dallas County website ( currentbids.html) for any addendums, updates, and/or changes to the bid solicitation?
Specify the name and telephone number of the account representative who will be handling and managing this account:
Should your firm be awarded this contract, describe what (if any) portion of the bid requirements will be subcontracted out:
Qty: 1 Lift = $5,973.00 each, Qty: 2 Jacks = $2,157.00 each . Installation $975.00
30 days
Installation cost does not include electric, concrete or air work
4050 days
One Year Yes Yes
Parts 2yrs, Structure 5 yrs.
Labor 1 yr.
A1 Automotive Equipment Repair Inc., 2623 Freewood Dr., Dallas, Texas 75220, 214.381.9529
King's Sales & Service, 1412 Bora Bora , Tool, Tx 75143, 903.432.4357
Net 30 days
NA
Yes
Yes
Fred Brotsky 214.634.2394 Installation of Lift & Jacks
Chris George 417.829.5879
Installation will be subcontracted to King's Sales and Service
Page 2 of 3
TABULATION SHEET Bid No. 20110275360 Contract for the Purchase and Installation of Automotive Shop Equipment and Other Related Accessories Opening Date: 13Dec2010
VENDOR #1 Myers Tire Supply Distribution, Inc.
1293 S. Main St. Akron, OH 44301 Michelle Stroup 972.291.9907 972.293.1068 fax
VENDOR #2 O'Reilly Automotive Inc. dba O'Reilly Auto Parts
233 S Patterson Springfield, MO 65802 Chris George 417.829.5879 800.925.0899 fax
VENDOR #3
DESCRIPTION:
Est.
Qty.
Does your firm/company have the required insurance
Yes
Yes
coverage stated under SECTION 3 INSURANCE
REQUIREMENTS
and agree to comply with these requirements during
the duration of this contract?
If No, will your firm be able to acquire the required
coverage within ten (10) days upon notification of
contract award?
Information on Provision of Health Insurance
Coverage for Employees
Dallas County may consider the provision of health
insurance coverage for employees in the bid
evaluation process (see page 5, paragraph 5). Please
complete the information below to assist in this
a) Does your company provide health insurance
Yes
Yes
coverage to its employees?
b) If your company does provide health insurance
Yes
No
coverage to its employees, does the company share in
the cost a minimum of 75% for employee only
coverage and 50% for family coverage?
c) If your company provides health insurance
No
Yes
coverage to its employees, is the coverage comparable
to the services provided by Dallas County as
described in the attached summary plan description?
(See Attachment A)
d) If your company plans to utilize subcontractors in
No
Yes
the fulfillment of this bid, does each of the
subcontractors provide health insurance coverage to
their employees that compares to Dallas County's
health insurance coverage and share in the cost?
Page 3 of 3
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.