BACK-UP operating procedure

[Pages:1]BACK-UP

operating procedure

1100 W, 1/2" drill with socket extension

UP

Skyfold motor with second shaft (up to 5 HP [3.73 kW])

Brake release lever

Maximum ascent time ~ 15 minutes

Brake release lever

Control box switch in OFF position

ON OFF

Second shaft Counter clockwise rotation = wall UP

In the unlikely event that the Skyfold wall does not respond to the key switch operation, it can now be operated by using a heavy duty drill. A shaft extension has been added to the motor allowing for an alternative method of raising and lowering the wall. This feature is now standard on all of our walls. This diagram is for illustration purposes only. Please refer to the applicable operating procedures for complete instructions.

To learn about other available products, please visit us.



For more information visit our website or contact us directly: MAIN OFFICE T 514 457-4767 F 514 457-7111 info@ 325 Lee Avenue, Montreal, Quebec, CANADA H9X 3S3

0311_5000

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download