Odot construction 2020

    • [DOCX File]SRTS Infrastructure Grant Worksheet - Oregon

      https://info.5y1.org/odot-construction-2020_1_e5cd17.html

      2020 Safe Routes to School Competitive Construction Grant WORKSHEET. PROGRAM DESCRIPTION: The Safe Routes to School Competitive Construction Grant Program is intended to fund bicycle and pedestrian projects that address a barrier to students walking and rolling to school.


    • [DOCX File]Sample A: Color Report Template Word docx

      https://info.5y1.org/odot-construction-2020_1_a4f875.html

      The ODOT SharePoint site for LPAs is not mandated other than to collect CUF and Prompt Payment forms completed in GoFormz. However, the LPA and ODOT will have the opportunity to utilize the SharePoint site for further use such as schedules, RFI, etc. This does not impact the information sharing between the LPA and their Construction Consultant.


    • [DOCX File]2020 SRTS Construction Program Signature Page

      https://info.5y1.org/odot-construction-2020_1_a07eef.html

      Author: FERGASON LeeAnne Created Date: 03/25/2020 14:02:00 Title: 2020 SRTS Construction Program Signature Page Keywords: 2020, srts, safe, routes, to, school ...


    • [DOCX File]ODOT Research / Implementation Topic Statement

      https://info.5y1.org/odot-construction-2020_1_1097d7.html

      ☐Construction☐Maintenance ☐Materials☐Traffic / Safety ☐Freight☐Rail ☐Transit☐Waterways ... PROPOSED PROJECT INFORMATION (ONLY A BRIEF DESCRIPTION IS NECESSARY. THOSE WHO SUBMIT THIS FORM MAY BE CONTACTED BY ODOT PERSONNEL FOR FURTHER CLARIFICATION) ... 12/22/2020 13:35:00 Title: ODOT Research / Implementation Topic Statement


    • [DOC File]Solicitation - Cable Installation and Relocation RFP ...

      https://info.5y1.org/odot-construction-2020_1_680956.html

      Type II fence and gate construction shall be in accordance with Section 624 of the Standard Specifications for Highway Construction, Edition of 2009 and all subsequent editions. ___ Fully Meets ___ Partially Meets ___ Meets w/Customization ___ Does Not Meet. Description: C.8.3.22 Cut and Repair – Asphalt Drive


    • [DOC File]Partnering - Ohio Department of Transportation

      https://info.5y1.org/odot-construction-2020_1_189e02.html

      2020 ELIGIBILITY REQUIREMENTS Projects must be substantially complete by Dec 31, 2019. All ODOT let construction projects are eligible. A project can only be nominated once for consideration of this Award. Projects must be nominated jointly by both the Prime Contractor and respective ODOT District. AWARD PROGRAM GUIDELINES


    • [DOCX File]ODOT Media Release - Stark County, Ohio

      https://info.5y1.org/odot-construction-2020_1_8b1d05.html

      This transportation improvement is scheduled for construction in summer 2020 and is expected to be completed in fall 2020. The estimated construction cost is approximately $700,000. ... carried-out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding, dated June 6, 2018, and executed by FHWA and ODOT.


    • [DOCX File]ODOT Media Release - Stark County, Ohio

      https://info.5y1.org/odot-construction-2020_1_913deb.html

      This transportation improvement is scheduled for construction in summer 2020 and is expected to be completed in fall 2020. The estimated construction cost is approximately $1,125,000. ... carried-out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding, dated June 6, 2018, and executed by FHWA and ODOT.


    • [DOCX File]POR-303-0.7/1.21

      https://info.5y1.org/odot-construction-2020_1_4a5664.html

      Consultants and/or ODOT Employees complete a draft nomination using this Word. template. Draft nominations (in MS Word format) are to be emailed to the respective ODOT District Capital Program Administrator (see the map and table below) by . Friday, March . 6, 2020



    • [DOCX File]Oklahoma Department of Transportation

      https://info.5y1.org/odot-construction-2020_1_9e0192.html

      FFY 2020 Request for Proposal. ... results from field monitoring of filter sock implementation will be used to inform the ODOT Storm Water Action Team for development of a standard and specification to use on ODOT construction sites. ... then the Storm Water Action Team can draft a standard and specification for use on ODOT construction project ...


    • [DOCX File]f.hubspotusercontent00.net

      https://info.5y1.org/odot-construction-2020_1_357fa3.html

      Katie can be reached at 971-718-6681 or katie.k.hubler@odot.state.or.us. FEMA Public Assistance Program and Policy Guide, Version 4, June 1, 2020. Public Assistance Debris Monitoring Guide, FEMA-327, August 2020. Debris Estimating Field Guide FEMA 329, September 2010. Public Assistance Debris Management Guide FEMA-325, July 2007. Joe Squire, PE


    • [DOC File]transportation.ohio.gov

      https://info.5y1.org/odot-construction-2020_1_3c09c9.html

      Project Sponsor ODOT LPA Manager ODOT District Construction Monitor-Project Other Attendees: Revised 3/2020. Author: atoohey Last modified by: Nichole Wade Created Date: 3/10/2020 2:31:00 PM Company: Ohio Department of Transportation ...


    • [DOC File]IMPORTANT INFORMATION REGARDING THE

      https://info.5y1.org/odot-construction-2020_1_67cc69.html

      the ODOT rate will be utilized. Equipment listed on the ODOT rates list is usually eligible. o If equipment is not on the ODOT standard rates list, a well-documented local fair market rental value may be used. o If equipment time is donated by an equipment rental business, documentation of standard rental rates on business letterhead is required.


    • [DOCX File]EAST 110th STREET RECONSTRUCTION

      https://info.5y1.org/odot-construction-2020_1_31c9eb.html

      ODOT-Let Bid: April – 2021 – July 2021 ... Estimated . Start Construction: August 2021. Estimated . Construction. Duration: 24 Months. Wards: Ward . 5 – Councilmember Phyllis Cleveland. 100% of project length . Author: dlueckel Created Date: 09/04/2020 10:09:00 Title: EAST 110th STREET RECONSTRUCTION Last modified by: Cook, Courtney ...


Nearby & related entries: